Building the studio

Building of the studio took place 2014-2015.
We tore out the basement of a resident villa and built everything up from the very ground.
The studio was acoustically designed by Claes Olsson at Eora Ljudteknik and the result is
really satisfactory!

Here are some pictures. Enjoy!